AUTUMN 2011 - 500KV SON LA – HIEP HOA TRANSMISSION LINE

Since February, 2006 Power Engineering Consulting Joint Stock Company 2 has been assigned as the main consultant for survey, design and supervision of “500kV Son La – Hiep Hoa Transmission line project with a scale of two circuits and a total length of 269 km. The transmission line passes through 5 mountainous provinces in the north (Son La, Phu Tho, Vinh Phuc, Thai Nguyen, Bac Giang) including the complicated and rough terrain of North - West mountainous region and the mid land area with a dramatical change in topography and geology.

PECC2 engineers who are in charge of design and survey have worked tiredlessly since the first hard days. They were present in the most difficult positions where isolated foundations are located to carry out design survey as well as solve all the prolems arising during construction process. Thanks to the intensive guidance of company leaders of National Power Transmission Corporation (NPT) and Management Board of Northern power projects, 90% of isolated foundations and over 60% of transmission lines have been completed by contruction units until September, 2011. The work has been quickly carried out to transmit the power from unit 4 of Son La hydropower plant which will generate power and join the national power network next December.

Let’s have a look at works of art which stand motionless in clouds, stretching transmission lines passing over mountains, rivers and streams like endless melody to be more proud of PECC2 employees’ minds and hearts:

Bright yellow sunshine in Tam Nong field – Phu Tho Province

Electric Tower ĐV52-107 passing over Red River (107 metre high)

Green melody on Deo Chen Mount (Bac Yen – Son La)

River crossing in Da River (1015 metre long)

Passing over clouds on Deo Con Mount (Son La)

The starting point of 500kV transmission line (Pi Toong - Muong La - Son La)

 

Chia sẻ: